Click to view table of contents for Chapters and Appendices
-
▼
2016
(16)
-
▼
February
(16)
- SUMMARY
- 1 PURPOSE OF AND NEED FOR PROPOSED ACTION
- 2 ALTERNATIVES
- 3 AFFECTED ENVIRONMENT
- 4 ENVIRONMENTAL CONSEQUENCES
- 5 COMMENTS AND COORDINATION
- 6 LIST OF PREPARERS
- 7 REFERENCES
- Vol 2: Appendix A - Plan & Profile Plates
- Vol 2, Appendix B - Technical Data
- Vol 2, Appendix C - Documentation of Public Partic...
- Vol 2, Appendix D - Gateway Lafayette Joint Use Ag...
- Vol. 2, Appendix E - I-49 Connector Section 106 Re...
- Vol. 2, Appendix F - Memorandum of Agreement
- Vol. 2, Appendix G - Joint Cooperative Endeavor Ag...
- Vol. 2, Appendix H - LCG Resolution of Locally Pre...
-
▼
February
(16)
Showing posts with label Locally preferred. Show all posts
Showing posts with label Locally preferred. Show all posts
Vol. 2, Appendix H - LCG Resolution of Locally Preferred Alternative
This resolution was adopted in February 2001. Are there aspects of the agreement that have changed or should have changed since that time?
Vol 2, Appendix C - Documentation of Public Participation Program
This long appendix contains a large number of items. It is attempting to document public participation and comments on the project. We are now told of the strong public support given to the project prior to alternative selection in the early 2000's. Do the comments published in this appendix support that contention? What fraction of public officials and others that were contacted expressed support for the project? What fraction of public comments supported the project?
One possible example of complete disclosure in this appendix is in the failure to fully document all public meetings and comments. Why are the meeting reports cited under "Other Elements" (page C-ii) not incorporated in the appendix? Are these reports still available?
- List of recipients with indication of those for which comments were received
- Newspaper advertisement- Published in The Times of Acadiana (Lafayette) on 6/17/98
- Summary ofMIS/Mode Meeting
- Newspaper advertisement- Published in The Times of Acadiana (Lafayette) on 6/15/98 & 6/22/98
- Comments Received Post Public Hearing Report
- Agency Comments and Responses Regarding DEIS
One possible example of complete disclosure in this appendix is in the failure to fully document all public meetings and comments. Why are the meeting reports cited under "Other Elements" (page C-ii) not incorporated in the appendix? Are these reports still available?
APPENDIX C Contents:
OTHER ELEMENTS OF THE PUBLIC PARTICIPATION PROGRAM
NOTICE OF INTENT ................................................................................................... C-1 to C-2
Published by office of the Federal Register Vol. 63, No. 711Tuesday, April 14, 1998
- SOLICITATION OF VIEWS AND RESPONSES RECEIVED ................................ C-3 to C-18
- List of recipients with indication of those for which comments were received
- 23 RESPONSES RECEIVED TO SOLICITATION OF VIEWS ............................... C-19 to C-87
- 3 ADDITIONAL LETTERS ASSOCIATED WITH THE SOLICITATION OF VIEWS ............. C-89 to C-96
- MIS/MODE PUBLIC MEETING ................................................................................ C-97 to C-98
- Newspaper advertisement- Published in The Times of Acadiana (Lafayette) on 6/17/98
- Summary ofMIS/Mode Meeting
- PUBLIC MEETING NOTICE ...................................................................................... C-99
- Newspaper advertisement- Published in The Times of Acadiana (Lafayette) on 6/15/98 & 6/22/98
- MISCELLANEOUS COMMENTS, CORRESPONDENCE ..................................... C-101 to C-186
- DOCUMENTATION FOR DECEMBER 14, 2000, PUBLIC HEARING AND DEIS AGENCY COMMENTS .......................................................................... C-187 to C-214
- Comments Received Post Public Hearing Report
- Agency Comments and Responses Regarding DEIS
2 ALTERNATIVES
How have the conditions changed that led to selection of the preferred alternative?
CHAPTER 2 - ALTERNATIVES
2.1 SELECTION OF REASONABLE ALTERNATIVES
2.2 ALTERNATIVES CONSIDERED
2.2.1 Types of Improvements
a No-Build
b Full Freeway
2.2.2 Alignment and Interchange Alternatives
a EA-1 Elevated
b EA-1 Selected Overpasses
c General Discussion of The RR Alternatives
d RR-3 Elevated
e RR-3 Selected Overpasses
f RR-4 Elevated
g RR-5 Elevated
2.2.3 Basic Laneage and Traffic Operations
a Basic Laneage
b Traffic Operations
2.2.4 Costs
2.3 ALTERNATIVES ELIMINATED FROM DETAILED STUDY
2.3.1 Rejected Conceptual Highway Types
2.3.2 Rejected Alignment and Interchange Alternatives
2.4 LOCALLY PREFERRED ALTERNATIVE
2.4.1 Alignment and Subaltematives
2.4.2 Description of Subaltemative F Modified (MPO Subaltemative)
2.5 SELECTED ALTERNATIVE
Subscribe to:
Posts (Atom)